The Beam Bridge challenge

Eden, Sam, Acadia, and Nola had to build a Y-bridge of a certain distance that supported their weight as they walked on it. 

Acadia shows us the last section to be built. 



Sam looks at the last section to consider its strength. 

Acadia starts a second run after part of the bridge collapsed on the first run. 

Acadia successfully passed the weakest part at the Y section. 

Acadia finishes and the challenge is met!

No comments:

Post a Comment